Penerapan SMAP
(belum memenuhi komitmen penerapan SMAP)No. | NIB | Nama BU | Subklasifikasi | Kualifikasi | LSBU | Noreg SBU | Tanggal Peringatan Tertulis | Peringatan Tertulis, Hari Kerja ke- | Tanggal Batas Waktu Pemenuhan Peringatan Tertulis | Pembekuan, Hari kerja Ke- | Tanggal Batas Waktu Pemenuhan Pembekuan | Keterangan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 8120109871751 | PRATIWI PUTRI SULUNG | ST004 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2023.0000802 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
2 | 8120312191492 | FREYSSINET TOTAL TECHNOLOGY | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0067509 | 2025-03-13 | - | 2025-04-10 | - | 2025-05-05 | Proses Sanksi |
3 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | ST004 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2022.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
4 | 0220006620248 | SPECTRATAMA PERKASA | BG005 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2022.0009658 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
5 | 0220006620248 | SPECTRATAMA PERKASA | BG009 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2022.0009658 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
6 | 9120101860299 | WULAN CIPTA SEJATI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0046182 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
7 | 1208220044371 | MANUNGGAL SEJAHTERA RAKKUTA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0027460 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
8 | 9120301140391 | INTAN SARANA TEKNIK | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0032956 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
9 | 9120301140391 | INTAN SARANA TEKNIK | BS006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0032956 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
10 | 9120101860299 | WULAN CIPTA SEJATI | BS016 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0046182 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
11 | 9120304362876 | BUMI RIAU INDAH JAYA | BS006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0019147 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
12 | 9120312022129 | OPUS INTERNATIONAL (M) BERHAD | RK003 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2024.0081487 | 2025-09-11 | - | 2025-10-01 | 2 | 2025-10-22 | Penghentian Sementara Kegiatan Berusaha |
13 | 0912220037589 | ZHONGSHI CHEMICAL ENGINEERING CONSTRUCTION INDONESIA | BS018 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0034551 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
14 | 0912220037589 | ZHONGSHI CHEMICAL ENGINEERING CONSTRUCTION INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0034551 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
15 | 8120313101149 | CHINA JINGYE ENGINEERING CORPORATION LIMITED | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0033648 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
16 | 9120301412538 | BINA NOVITA | BG009 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0068629 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
17 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BG001 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2023.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
18 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BG002 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2023.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
19 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BG003 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2023.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
20 | 9120406841025 | BANGUN KARYA PERKASA JAYA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0039365 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
21 | 9120406841025 | BANGUN KARYA PERKASA JAYA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0039365 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
22 | 0201010000737 | FATIMAH INDAH UTAMA | BS004 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2023.0038234 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
23 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0043799 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
24 | 8120113102328 | MCC20 INDONESIA CONSTRUCTION | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2023.0046870 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
25 | 0277001921502 | PADMA INTI INDONESIA | BG009 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0055661 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
26 | 9120001500094 | TRIMITRA ABADI ARTHA MANDIRI | BG009 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2023.0049466 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
27 | 8120202870786 | JETEC INDONESIA | RK004 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2023.0051068 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
28 | 8120202870786 | JETEC INDONESIA | RT002 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RT.B.11.2023.0051068 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
29 | 9120002481217 | ABUN SENDI | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0050614 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
30 | 9120105731028 | BAHAS REKASATYA | BS011 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2023.0030639 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
31 | 9120008771589 | FUDING MANDIRI SEJAHTERA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2023.0022875 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
32 | 0220106350949 | KMU KONSTRUKSI INDONESIA | BS020 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0055494 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
33 | 0908230111893 | OVERSEAS INTL ENGINEERING INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0055609 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
34 | 0277001921502 | PADMA INTI INDONESIA | BS001 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0055661 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
35 | 0220004572673 | MENARD GEOSYSTEMS, SDN. BHD. | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0056210 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
36 | 9120106641371 | VIN SEPTA JAYA | BS003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0062201 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
37 | 8120014080517 | HAN JIN KONSTRUKSI INDONESIA | BG003 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2023.0057952 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
38 | 8120000922019 | DAEAH E & C INDONESIA | BS004 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0006150 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
39 | 0107220043249 | LIXING LABOUR SERVICE | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0036961 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
40 | 8120107872838 | NITTOC CONSTRUCTION INDONESIA | BS006 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0001737 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
41 | 0220106531037 | BANGUNAN TEKNIK GRUP | GT002 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0009155 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
42 | 0220106531037 | BANGUNAN TEKNIK GRUP | GT005 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0009155 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
43 | 0220106531037 | BANGUNAN TEKNIK GRUP | GT006 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0009155 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
44 | 8120112122491 | TRACON INDUSTRI | BS005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2023.0023305 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
45 | 9120300931332 | BUMI DELTA HATTEN | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0022504 | 2025-04-18 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
46 | 9120205741111 | SUMBERDAYA SEWATAMA | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0066401 | 2025-03-02 | - | 2025-03-21 | - | 2025-04-22 | Proses Sanksi |
47 | 9120205651372 | ANNAHL ABADI BERSAMA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0039595 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
48 | 2305230007976 | KOLON GLOBAL CORPORATION | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0062714 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
49 | 9120408860392 | SUMBER MITRA JAYA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065612 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
50 | 2309220019736 | ANUGERAH LESTARI SUPINDO KONSTRUKSI | BG003 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2024.0022122 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
51 | 0905230083369 | SHANDONG ZIJIAN CONSTRUCTION GROUP CO., LTD | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0044222 | 2025-03-11 | - | 2025-04-08 | - | 2025-04-30 | Proses Sanksi |
52 | 9120300592822 | SUBOTA INTERNATIONAL CONTRACTOR | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0018344 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
53 | 9120002540663 | REKSA JAYA INDAH | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0063113 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
54 | 0220100800478 | RELIS SAPINDO UTAMA | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0009563 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
55 | 8120119291511 | PUTRA MUDA MANDIRI GROUP | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0050139 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
56 | 9120101860299 | WULAN CIPTA SEJATI | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0046182 | 2025-04-27 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
57 | 9120408860392 | SUMBER MITRA JAYA | BS010 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065612 | 2025-02-24 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
58 | 0220109662062 | MIN HUI INDONESIA | BS004 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0060673 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
59 | 9120507841931 | LIVIA ANDALAN INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0040966 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
60 | 1409230119244 | CONFINDO LAKSANA ABADI | GT003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0062819 | 2025-02-26 | - | 2025-03-18 | - | 2025-04-16 | Proses Sanksi |
61 | 0501230058528 | SINAR PURNA KARYA | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0066061 | 2025-02-28 | - | 2025-03-20 | - | 2025-04-21 | Proses Sanksi |
62 | 9120002341028 | KARYA MANDIRI KONTRAKTOR | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0063951 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
63 | 0220004210656 | CIPTA MARGA PERSADA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0005313 | 2025-02-16 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
64 | 8120010162806 | ANHUI ELECTRIC POWER CONSTRUCTION INDONESIA | BG003 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0023073 | 2025-04-09 | - | 2025-04-30 | - | 2025-05-26 | Proses Sanksi |
65 | 8120217011891 | RAFA KARYA INDONESIA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0005862 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
66 | 0256010181337 | TRISAKTI CIPTA NUSANTARA | BS011 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0064664 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
67 | 9120202302659 | TUNAS HARAPAN LAKINAWOLIO | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0062264 | 2025-03-12 | - | 2025-04-09 | - | 2025-05-02 | Proses Sanksi |
68 | 8120118011281 | SPEKTRUM KRISINDO ELEKTRIKA | ST006 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0036494 | 2025-03-19 | - | 2025-04-16 | - | 2025-05-09 | Proses Sanksi |
69 | 9120309541634 | ANGGAZA WIDYA RIDHAMULIA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0012128 | 2025-02-21 | - | 2025-03-13 | - | 2025-04-11 | Proses Sanksi |
70 | 0277001921502 | PADMA INTI INDONESIA | BS007 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BS.B.09.2024.0055661 | 2025-02-19 | - | 2025-03-11 | - | 2025-04-09 | Proses Sanksi |
71 | 0220208851128 | KURNIA LAKSONO | BS004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0060178 | 2025-02-25 | - | 2025-03-17 | - | 2025-04-15 | Proses Sanksi |
72 | 3001220016616 | KINAYA LIAN INDAH | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0007225 | 2025-02-26 | - | 2025-03-18 | - | 2025-04-16 | Proses Sanksi |
73 | 0911230061235 | MEGA JAYA KONSTRUKSI NUSANTARA | BG003 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0058117 | 2025-02-28 | - | 2025-03-20 | - | 2025-04-21 | Proses Sanksi |
74 | 0911230061235 | MEGA JAYA KONSTRUKSI NUSANTARA | BG002 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0058117 | 2025-03-01 | - | 2025-03-21 | - | 2025-04-22 | Proses Sanksi |
75 | 0220001281279 | LABROSCO YAL | BS001 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0065301 | 2025-02-21 | - | 2025-03-13 | - | 2025-04-11 | Proses Sanksi |
76 | 0220109492805 | TIGA BIDADARI KARON | BS010 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0035914 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
77 | 9120014000269 | SRIWIJAYA SUMBER SAKTI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065740 | 2025-02-25 | - | 2025-03-17 | - | 2025-04-15 | Proses Sanksi |
78 | 2102240016237 | HUACHANG KONSTRUKSI INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0068520 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
79 | 0220003120767 | YUNG XING INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0064956 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
80 | 9120207602219 | ASINDO TECH | BG003 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0066956 | 2025-03-07 | - | 2025-03-27 | - | 2025-04-28 | Proses Sanksi |
81 | 0220106290144 | Thermax Limited | ST003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0069755 | 2025-04-02 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
82 | 9120305722223 | AREMIX PLANINDO | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0064616 | 2025-03-06 | - | 2025-03-26 | - | 2025-04-25 | Proses Sanksi |
83 | 2309210052078 | SUKSES ABADI KONSTRUKSI INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0004448 | 2025-03-05 | - | 2025-03-25 | - | 2025-04-24 | Proses Sanksi |
84 | 0220107600623 | SHENYANG ALUMINUM AND MAGNESIUM ENGINEERING & RESEARCH INSTITUTE CO., LTD. | ST010 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0068102 | 2025-03-19 | - | 2025-04-16 | - | 2025-05-09 | Proses Sanksi |
85 | 8120216062523 | RIFANSI DWI PUTRA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0002909 | 2025-03-08 | - | 2025-03-28 | - | 2025-04-29 | Proses Sanksi |
86 | 9120005402369 | JAGAT KONSTRUKSI ABDIPERSADA | BG001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0069779 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
87 | 1234000563517 | BINTANG SEMBILAN INDAH | BG002 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0061693 | 2025-03-20 | - | 2025-04-17 | - | 2025-05-14 | Proses Sanksi |
88 | 9120400282953 | WISMA SARANA TEKNIK | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0021462 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
89 | 1212230129246 | HENGFA CONSTRUCTION INDONESIA | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0066977 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
90 | 3011230049944 | YANLORD TEKNOLOGI ENGINEERING | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0068521 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
91 | 1201240069013 | KONSTRUKSI RAJAWALI POWER INDONESIA | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0068612 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
92 | 2909210046295 | MELO ANEKA RAYA | BS005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0068676 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
93 | 8120008971941 | POESER INDONESIA | ST003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0082762 | 2025-09-26 | 6 | 2025-10-16 | |||
94 | 9120011140679 | RAJA MULTI SARANA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0042910 | 2025-03-26 | - | 2025-04-24 | - | 2025-05-20 | Proses Sanksi |
95 | 0220000531579 | BUMI CAKRAWALA INFRASTRUKTUR | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0044064 | 2025-03-28 | - | 2025-04-28 | - | 2025-05-22 | Proses Sanksi |
96 | 0220004151043 | SEMITER | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0070798 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
97 | 9120005402369 | JAGAT KONSTRUKSI ABDIPERSADA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0069779 | 2025-04-02 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
98 | 9120009102686 | BIRA JAYA MANDIRI PERKASA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0025898 | 2025-04-01 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
99 | 9120203840291 | PUTRA RATO MAHKOTA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0069973 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
100 | 9120203840291 | PUTRA RATO MAHKOTA | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0069973 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
101 | 9120203840291 | PUTRA RATO MAHKOTA | BG007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0069973 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
102 | 9120013110825 | PRIBUMI GROUP INDONESIA | BS001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0069685 | 2025-04-01 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
103 | 9120109451711 | MODERNATEHNIK PERKASA | BS001 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0000104 | 2025-04-03 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
104 | 9120302300849 | ARKAMAYA WANGSA ALI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0002836 | 2025-04-01 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
105 | 0223011032854 | KARYA PERDANA BARU | BG007 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0070672 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
106 | 1251000622253 | MITRA INFRASTRUKTUR SEJAHTERA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0028142 | 2025-04-09 | - | 2025-04-30 | - | 2025-05-26 | Proses Sanksi |
107 | 9120103210916 | ASIA TENGAH KONSTRUKSI | BG002 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0025804 | 2025-04-12 | - | 2025-05-06 | - | 2025-06-02 | Proses Sanksi |
108 | 9120103210916 | ASIA TENGAH KONSTRUKSI | BG001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0025804 | 2025-04-12 | - | 2025-05-06 | - | 2025-06-02 | Proses Sanksi |
109 | 8120203702676 | ZHEJIANG TENAGA PEMBANGUNAN INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0061857 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
110 | 9120408860392 | SUMBER MITRA JAYA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065612 | 2025-04-18 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
111 | 0901240039683 | TELINCO NETWORKS INDONESIA | BS009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0066958 | 2025-04-26 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
112 | 9120101860299 | WULAN CIPTA SEJATI | BG005 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0046182 | 2025-04-26 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
113 | 8120001731461 | ENERGY CHINA TIANJIN INDONESIA | BG003 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0079212 | 2025-09-26 | 6 | 2025-10-16 | |||
114 | 0220004151043 | SEMITER | BG003 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0070798 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
115 | 8120006830422 | UNISON KARYATAMA | BS007 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0072477 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
116 | 9120206451966 | SINAR BARU KONTRUKSI | BG003 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0072706 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
117 | 0220000531579 | BUMI CAKRAWALA INFRASTRUKTUR | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0044064 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
118 | 8120218012845 | CIPTA GRAHA KANAKA | BG007 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0073731 | 2025-05-22 | - | 2025-06-17 | - | 2025-07-09 | Proses Sanksi |
119 | 9120200641972 | MARGA DWITAGUNA | BS001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0034733 | 2025-05-22 | - | 2025-06-17 | - | 2025-07-09 | Proses Sanksi |
120 | 0246010240429 | LESTARI NAULI JAYA | BS005 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0060550 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
121 | 8120001870963 | BUMILOKA TEGARPERKASA | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0070633 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
122 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0043799 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
123 | 9120300730691 | CHINA FIRST METALLURGICAL INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0073993 | 2025-05-24 | - | 2025-06-19 | - | 2025-07-11 | Proses Sanksi |
124 | 8120119271505 | GEOTEKINDO | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0071683 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
125 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG008 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0043799 | 2025-05-26 | - | 2025-06-19 | - | 2025-07-11 | Proses Sanksi |
126 | 9120200641972 | MARGA DWITAGUNA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0034733 | 2025-05-24 | - | 2025-06-19 | - | 2025-07-11 | Proses Sanksi |
127 | 8120108801039 | PURNAMA INDONESIA | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0032327 | 2025-06-07 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
128 | 8120019202518 | TRIMANUNGGAL KARYATAMA | BG009 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0026535 | 2025-07-28 | - | 2025-08-15 | - | 2025-09-08 | Proses Sanksi |
129 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0043799 | 2025-05-29 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
130 | 0223011032854 | KARYA PERDANA BARU | BG002 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0070672 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
131 | 9120009871301 | ZTE INDONESIA | ST010 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0076983 | 2025-07-23 | - | 2025-08-12 | - | 2025-09-02 | Proses Sanksi |
132 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0043799 | 2025-05-31 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
133 | 2505220053451 | SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE CO.,LTD | ST003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0081592 | 2025-06-04 | - | 2025-06-26 | - | 2025-07-18 | Proses Sanksi |
134 | 8120112130894 | NIAGAMAS SETIAUSAHA | BS007 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0019340 | 2025-06-11 | - | 2025-07-02 | - | 2025-07-23 | Proses Sanksi |
135 | 0252001900578 | JJB RUANG KREASI | BG007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
136 | 0308220019248 | PERUMAHAN BLUESKY BOARD | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0020653 | 2025-06-07 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
137 | 8120016152418 | BENGALON JAYA LESTARI | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0076155 | 2025-06-15 | - | 2025-07-07 | - | 2025-07-28 | Proses Sanksi |
138 | 2801240025517 | PRABA INDOPERSADA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0073021 | 2025-06-06 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
139 | 2801240025517 | PRABA INDOPERSADA | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0073021 | 2025-06-07 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
140 | 8120005942313 | MUTU UTAMA KONSTRUKSI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0059023 | 2025-08-02 | - | 2025-08-22 | - | 2025-09-15 | Proses Sanksi |
141 | 0252001900578 | JJB RUANG KREASI | BG001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-06-06 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
142 | 0252001900578 | JJB RUANG KREASI | BG003 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-06-06 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
143 | 9120305940093 | BELIMBING SRIWIJAYA | BG001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0029257 | 2025-08-09 | - | 2025-08-29 | - | 2025-09-22 | Proses Sanksi |
144 | 9120300730691 | CHINA FIRST METALLURGICAL INDONESIA | BS010 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0073993 | 2025-06-11 | - | 2025-07-02 | - | 2025-07-23 | Proses Sanksi |
145 | 1008230082629 | PEARL RIVER INDONESIA | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0056033 | 2025-06-08 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
146 | 9120503702291 | LAVERTON PROTECTION TECHNOLOGY | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0055376 | 2025-07-26 | - | 2025-08-15 | - | 2025-09-08 | Proses Sanksi |
147 | 9120002480082 | JATI WANGI | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0024613 | 2025-06-09 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
148 | 0220106102446 | TRIMEDIA IMAJI REKSO ABADI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0075460 | 2025-06-10 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
149 | 9120212261521 | BATHARA JAYA SARTIKA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0056407 | 2025-08-01 | - | 2025-08-21 | - | 2025-09-12 | Proses Sanksi |
150 | 1812210007548 | LIMADUA SAKTI PESONA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0076146 | 2025-06-17 | - | 2025-07-08 | - | 2025-07-29 | Proses Sanksi |
151 | 0252001900578 | JJB RUANG KREASI | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-07-22 | - | 2025-08-11 | - | 2025-09-01 | Proses Sanksi |
152 | 1008230082629 | PEARL RIVER INDONESIA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0056033 | 2025-06-15 | - | 2025-07-07 | - | 2025-07-28 | Proses Sanksi |
153 | 1008230082629 | PEARL RIVER INDONESIA | BG008 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0056033 | 2025-06-20 | - | 2025-07-11 | - | 2025-08-01 | Proses Sanksi |
154 | 9120205232172 | AMCO JAYA TRI TUNGGAL PRATAMA | BG004 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0061405 | 2025-06-17 | - | 2025-07-08 | - | 2025-07-29 | Proses Sanksi |
155 | 8120007922019 | CHINA RAILWAY ENGINEERING INDONESIA | BS010 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0013881 | 2025-06-20 | - | 2025-07-11 | - | 2025-08-01 | Proses Sanksi |
156 | 9120007390754 | DOOSAN HEAVY INDUSTRIES INDONESIA | ST003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0080951 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
157 | 9120318132663 | PIJAR UTAMA | BG009 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0077158 | 2025-08-17 | - | 2025-09-08 | - | 2025-09-29 | Proses Sanksi |
158 | 9120200242526 | RATU KARYA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0017022 | 2025-08-04 | - | 2025-08-22 | - | 2025-09-15 | Proses Sanksi |
159 | 2806240029868 | KONSTRUKSI SUKSES BERJAYA | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0081170 | 2025-09-05 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
160 | 2806240029868 | KONSTRUKSI SUKSES BERJAYA | BS011 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0081170 | 2025-09-05 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
161 | 0220002201777 | INDO DHEA INTERNUSA | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0079032 | 2025-08-12 | - | 2025-09-01 | - | 2025-09-23 | Proses Sanksi |
162 | 1104230079746 | NANYANG SAHABAT PERKASA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0044648 | 2025-08-21 | - | 2025-09-11 | - | 2025-10-02 | Proses Sanksi |
163 | 9120301320953 | SEVEN GATES INDONESIA | BS010 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0000978 | 2025-08-01 | - | 2025-08-21 | - | 2025-09-12 | Proses Sanksi |
164 | 8120001731461 | ENERGY CHINA TIANJIN INDONESIA | ST003 | Besar | BINA MITRA RANCANGBANGUN (GAPENRI) | F.2.03.ST.B.06.2024.0079212 | 2025-08-14 | - | 2025-09-03 | - | 2025-09-25 | Proses Sanksi |
165 | 0705230020859 | KISEN GLOBAL PROJECT DESIGN AND CONSTRUCTION | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0061816 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
166 | 8120017001254 | RIGSIS ENERGI INDONESIA | RT002 | Besar | PERKONINDO KONSULTAN KONSTRUKSI MANDIRI | F.3.01.RT.B.16.2024.0078563 | 2025-08-07 | - | 2025-08-27 | - | 2025-09-18 | Proses Sanksi |
167 | 2103240132735 | DONGYANG ENGINEERING INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0078986 | 2025-08-10 | - | 2025-08-29 | - | 2025-09-22 | Proses Sanksi |
168 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BS001 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0024433 | 2025-09-05 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
169 | 0702240040534 | LARSEN AND TOUBRO LIMITED | BS003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0078388 | 2025-08-07 | - | 2025-08-27 | - | 2025-09-18 | Proses Sanksi |
170 | 0220004520458 | INDI DAYA REKAPRATAMA | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0042139 | 2025-08-12 | - | 2025-09-01 | - | 2025-09-23 | Proses Sanksi |
171 | 0220104600899 | WIDYA SATRIA | BG002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0001832 | 2025-08-16 | - | 2025-09-08 | - | 2025-09-29 | Proses Sanksi |
172 | 0220002201777 | INDO DHEA INTERNUSA | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0079032 | 2025-08-12 | - | 2025-09-01 | - | 2025-09-23 | Proses Sanksi |
173 | 0220002201777 | INDO DHEA INTERNUSA | BG005 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0079032 | 2025-08-12 | - | 2025-09-01 | - | 2025-09-23 | Proses Sanksi |
174 | 1217000350747 | SMCGC KONSTRUKSI INDONESIA | BG003 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0076801 | 2025-08-01 | - | 2025-08-21 | - | 2025-09-12 | Proses Sanksi |
175 | 9120000350445 | CREATION HEAVY INDUSTRY | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0078852 | 2025-08-09 | - | 2025-08-29 | - | 2025-09-22 | Proses Sanksi |
176 | 8120110011706 | TAISEI CORPORATION | BS003 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0047994 | 2025-08-13 | - | 2025-09-02 | - | 2025-09-24 | Proses Sanksi |
177 | 8120310003305 | KREATIF MANDIRI SAKTI | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0033722 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
178 | 9120301920329 | HAPSAKA MAS | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0023158 | 2025-08-28 | - | 2025-09-18 | 11 | 2025-10-09 | Penghentian Sementara Kegiatan Berusaha |
179 | 8120113290465 | KEMBAR ABADI PRIMA | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065984 | 2025-08-13 | - | 2025-09-02 | - | 2025-09-24 | Proses Sanksi |
180 | 9120205153602 | FARMEL CIPTA MANDIRI | BS005 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BS.B.03.2024.0022065 | 2025-09-26 | 6 | 2025-10-16 | |||
181 | 0288010231283 | RILINE ARSITEK INDONESIA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0078009 | 2025-08-09 | - | 2025-08-29 | - | 2025-09-22 | Proses Sanksi |
182 | 0612230085926 | WINNYRA MANDIRI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0064018 | 2025-09-08 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
183 | 1607240087938 | Shenyang Duowei Genau Construction Engineering Co.,Ltd | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0078985 | 2025-08-10 | - | 2025-08-29 | - | 2025-09-22 | Proses Sanksi |
184 | 9120503981627 | DUTARAYA DINAMETRO | BS005 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0051144 | 2025-08-09 | - | 2025-08-29 | - | 2025-09-22 | Proses Sanksi |
185 | 0402220036635 | SUMBER CIPTA YOENANDA | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0079866 | 2025-08-21 | - | 2025-09-11 | - | 2025-10-02 | Proses Sanksi |
186 | 2103240132735 | DONGYANG ENGINEERING INDONESIA | BS007 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0078986 | 2025-08-14 | - | 2025-09-03 | - | 2025-09-25 | Proses Sanksi |
187 | 9120318132663 | PIJAR UTAMA | BS003 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0077158 | 2025-08-28 | - | 2025-09-18 | 11 | 2025-10-09 | Penghentian Sementara Kegiatan Berusaha |
188 | 8120012292814 | KORINDO KONSTRUKSI | BG003 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2024.0074923 | 2025-08-15 | - | 2025-09-04 | - | 2025-09-26 | Proses Sanksi |
189 | 0288010231283 | RILINE ARSITEK INDONESIA | BG004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0078009 | 2025-08-16 | - | 2025-09-08 | - | 2025-09-29 | Proses Sanksi |
190 | 2706240063944 | HASIMAH INDAH PRIMA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0079974 | 2025-09-09 | - | 2025-09-29 | 4 | 2025-10-20 | Penghentian Sementara Kegiatan Berusaha |
191 | 2505230051731 | PARAMA AGUNG KARYA | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0058802 | 2025-08-19 | - | 2025-09-09 | - | 2025-09-30 | Proses Sanksi |
192 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | ST006 | Besar | BINA MITRA RANCANGBANGUN (GAPENRI) | F.2.03.ST.B.06.2024.0043799 | 2025-08-22 | - | 2025-09-12 | - | 2025-10-03 | Penghentian Sementara Kegiatan Berusaha |
193 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | ST010 | Besar | BINA MITRA RANCANGBANGUN (GAPENRI) | F.2.03.ST.B.06.2024.0043799 | 2025-08-30 | - | 2025-09-22 | 9 | 2025-10-13 | Penghentian Sementara Kegiatan Berusaha |
194 | 9120407782936 | SEJAHTERA MULIA KENCANA | BG009 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0061154 | 2025-08-21 | - | 2025-09-11 | - | 2025-10-02 | Proses Sanksi |
195 | 9120407782936 | SEJAHTERA MULIA KENCANA | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0061154 | 2025-08-22 | - | 2025-09-12 | - | 2025-10-03 | Penghentian Sementara Kegiatan Berusaha |
196 | 9120407782936 | SEJAHTERA MULIA KENCANA | BG004 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0061154 | 2025-08-22 | - | 2025-09-12 | - | 2025-10-03 | Penghentian Sementara Kegiatan Berusaha |
197 | 9120407782936 | SEJAHTERA MULIA KENCANA | BG006 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0061154 | 2025-08-22 | - | 2025-09-12 | - | 2025-10-03 | Penghentian Sementara Kegiatan Berusaha |
198 | 9120407782936 | SEJAHTERA MULIA KENCANA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0061154 | 2025-08-21 | - | 2025-09-11 | - | 2025-10-02 | Proses Sanksi |
199 | 8120112012147 | PATRA DRILLING CONTRACTOR | BS013 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0038040 | 2025-08-30 | - | 2025-09-22 | 9 | 2025-10-13 | Penghentian Sementara Kegiatan Berusaha |
200 | 1106230010356 | ADIPATRIA DHARMA | BS001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0081504 | 2025-09-11 | - | 2025-10-01 | 2 | 2025-10-22 | Penghentian Sementara Kegiatan Berusaha |
201 | 2002220023265 | JORINDO AGUNG | BS011 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0061319 | 2025-10-03 | 1 | 2025-10-23 | |||
202 | 9120302311087 | MINARTA DUTAHUTAMA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0011371 | 2025-08-24 | - | 2025-09-15 | 14 | 2025-10-06 | Penghentian Sementara Kegiatan Berusaha |
203 | 9120404232814 | MULTI KARYA PRATAMA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0018109 | 2025-08-24 | - | 2025-09-15 | 14 | 2025-10-06 | Penghentian Sementara Kegiatan Berusaha |
204 | 1201000230248 | TUNAS INTERCOMINDO SEJATI | RK002 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2024.0082369 | 2025-09-20 | 10 | 2025-10-10 | |||
205 | 9120104732831 | HUTAN ALAM | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0052166 | 2025-08-28 | - | 2025-09-18 | 11 | 2025-10-09 | Penghentian Sementara Kegiatan Berusaha |
206 | 1201000230248 | TUNAS INTERCOMINDO SEJATI | RK001 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2024.0082369 | 2025-09-20 | 10 | 2025-10-10 | |||
207 | 0312210007992 | SINAR GUNDALING | BS004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0075633 | 2025-08-28 | - | 2025-09-18 | 11 | 2025-10-09 | Penghentian Sementara Kegiatan Berusaha |
208 | 1201000230248 | TUNAS INTERCOMINDO SEJATI | RK005 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2024.0082369 | 2025-09-20 | 10 | 2025-10-10 | |||
209 | 9120503981627 | DUTARAYA DINAMETRO | BS006 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0051144 | 2025-08-24 | - | 2025-09-15 | 14 | 2025-10-06 | Penghentian Sementara Kegiatan Berusaha |
210 | 1201000230248 | TUNAS INTERCOMINDO SEJATI | RT001 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RT.B.11.2024.0082369 | 2025-09-20 | 10 | 2025-10-10 | |||
211 | 8120108870624 | SRIKANDI SRI BAWANA | AR001 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.AR.B.11.2024.0074562 | 2025-08-30 | - | 2025-09-22 | 9 | 2025-10-13 | Penghentian Sementara Kegiatan Berusaha |
212 | 2706240063944 | HASIMAH INDAH PRIMA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0079974 | 2025-09-09 | - | 2025-09-29 | 4 | 2025-10-20 | Penghentian Sementara Kegiatan Berusaha |
213 | 9120005101084 | BORNEO MAJUJAYA | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0080811 | 2025-08-30 | - | 2025-09-22 | 9 | 2025-10-13 | Penghentian Sementara Kegiatan Berusaha |
214 | 9120307451823 | INDO MULYA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0051064 | 2025-08-31 | - | 2025-09-22 | 9 | 2025-10-13 | Penghentian Sementara Kegiatan Berusaha |
215 | 9120008411082 | DAMAI INDAH UTAMA | BG005 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0081178 | 2025-09-08 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
216 | 2901240090307 | REKAYASA TEKNOLOGI KONSTRUKSI | RK002 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2024.0070163 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
217 | 0702220059772 | Shanghai Tunnel Engineering Co (Singapore) Pte. Ltd. | BS006 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0029321 | 2025-08-30 | - | 2025-09-22 | 9 | 2025-10-13 | Penghentian Sementara Kegiatan Berusaha |
218 | 8120004812589 | B.L. HARBERT INTERNATIONAL LLC | BG009 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0083018 | 2025-10-01 | 3 | 2025-10-21 | |||
219 | 9120008411082 | DAMAI INDAH UTAMA | BG002 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0081178 | 2025-09-08 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
220 | 9120006993009 | PUTERA BORNEO SAKTI | BS001 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BS.B.03.2024.0004701 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
221 | 9120206491825 | BUMI SIAK MAKMUR | BG006 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0028677 | 2025-09-04 | - | 2025-09-25 | 6 | 2025-10-16 | Penghentian Sementara Kegiatan Berusaha |
222 | 9120408282873 | KENTJANA SAKTI INDONESIA | BS007 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0081284 | 2025-09-08 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
223 | 0220207380956 | BINAYASA PUTRABATARA | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0057234 | 2025-09-03 | - | 2025-09-24 | 7 | 2025-10-15 | Penghentian Sementara Kegiatan Berusaha |
224 | 1296000632684 | TERAS TEKNIK PERDANA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0057623 | 2025-09-06 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
225 | 0220302211625 | CAHAYA BARU PRIMA | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0081671 | 2025-09-13 | 15 | 2025-10-03 | |||
226 | 0220009242964 | BAWAKARAENG PURNAMA WIJAYA | BS004 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0081645 | 2025-10-01 | 3 | 2025-10-21 | |||
227 | 1502220063593 | LUMBUNG ANUGERAH MANDIRI | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0081424 | 2025-09-08 | - | 2025-09-26 | 5 | 2025-10-17 | Penghentian Sementara Kegiatan Berusaha |
228 | 9120307451823 | INDO MULYA | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0051064 | 2025-09-14 | 15 | 2025-10-03 | |||
229 | 0220009242964 | BAWAKARAENG PURNAMA WIJAYA | BS010 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0081645 | 2025-09-11 | - | 2025-10-01 | 2 | 2025-10-22 | Penghentian Sementara Kegiatan Berusaha |
230 | 9120109520482 | FOCON ANGGUN KARYA | BS014 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0032043 | 2025-10-03 | 1 | 2025-10-23 | |||
231 | 9120100140735 | UNO TANOH SEURAMO | BG006 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0082949 | 2025-09-27 | 5 | 2025-10-17 | |||
232 | 8120210221249 | KARYA MENTARI SERAYA | BG002 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2024.0020102 | 2025-09-26 | 6 | 2025-10-16 | |||
233 | 1107240055542 | FUJIAN KONSTRUKSI INDONESIA | BG003 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2024.0082352 | 2025-09-20 | 10 | 2025-10-10 | |||
234 | 9120003271812 | CHRISTI MANUNGGAL | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0048794 | 2025-10-04 | 0 | 2025-10-24 | |||
235 | 9120003271812 | CHRISTI MANUNGGAL | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0048794 | 2025-10-04 | 0 | 2025-10-24 | |||
236 | 1247000633609 | LANDASAN TEKNIK LESTARI | BG002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0024221 | 2025-10-01 | 3 | 2025-10-21 | |||
237 | 0220007672859 | ALFA MEDIA ADIJAYA | BS005 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0082802 | 2025-09-26 | 6 | 2025-10-16 | |||
238 | 8120110001277 | SPACE TECHNOLOGY | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0082801 | 2025-09-26 | 6 | 2025-10-16 | |||
239 | 9120001261368 | SIGMAGRAHA ARKANANTA | BG005 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0082984 | 2025-10-01 | 3 | 2025-10-21 | |||
240 | 9120105692567 | KREASI SEMESTA NUSA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0083118 | 2025-10-01 | 3 | 2025-10-21 | |||
241 | 8120001761666 | INTI KARYA INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0030681 | 2025-09-27 | 5 | 2025-10-17 | |||
242 | 9120200781312 | ADHIYASA DESICON | RK003 | Besar | PERKONINDO KONSULTAN KONSTRUKSI MANDIRI | F.3.01.RK.B.16.2024.0083243 | 2025-10-03 | 1 | 2025-10-23 | |||
243 | 9120105692567 | KREASI SEMESTA NUSA | BG002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0083118 | 2025-10-01 | 3 | 2025-10-21 | |||
244 | 9120308382116 | WINSOLUSI KONSULTAN | RK003 | Besar | Lembaga Sertifikasi INKINDO | F.3.01.RK.B.02.2024.0083264 | 2025-10-03 | 1 | 2025-10-23 | |||
245 | 9120308382116 | WINSOLUSI KONSULTAN | RK002 | Besar | Lembaga Sertifikasi INKINDO | F.3.01.RK.B.02.2024.0083264 | 2025-10-03 | 1 | 2025-10-23 | |||
246 | 9120308382116 | WINSOLUSI KONSULTAN | RK001 | Besar | Lembaga Sertifikasi INKINDO | F.3.01.RK.B.02.2024.0083264 | 2025-10-03 | 1 | 2025-10-23 | |||
247 | 9120001261368 | SIGMAGRAHA ARKANANTA | BG009 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0082984 | 2025-10-01 | 3 | 2025-10-21 | |||
248 | 9120105692567 | KREASI SEMESTA NUSA | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0083118 | 2025-10-01 | 3 | 2025-10-21 | |||
249 | 1247000633609 | LANDASAN TEKNIK LESTARI | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0024221 | 2025-10-01 | 3 | 2025-10-21 | |||
250 | 1247000633609 | LANDASAN TEKNIK LESTARI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0024221 | 2025-10-03 | 1 | 2025-10-23 | |||
251 | 8120019201438 | LUTHFIATAMA JAYA MANDIRI KONSTRUKSI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0016345 | 2025-10-01 | 3 | 2025-10-21 | |||
252 | 1306230107292 | SUKSES KONSTRUKSI INDONUSA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0045677 | 2025-10-03 | 1 | 2025-10-23 |
2. BUJK yang tidak melakukan pemenuhan persyaratan dan/atau memenuhi kewajiban sesuai dengan peraturan perundang-undangan sampai dengan batas waktu 15 (lima belas) hari kerja sejak ditayangkan peringatan tertulis, maka akan dilakukan penghentian sementara kegiatan berusaha dalam Sistem Informasi Jasa Konstruksi berupa turun tayang SBU.
3. BUJK yang tidak memenuhi kewajiban dalam jangka waktu 15 (lima belas) hari kerja sejak pengenaan sanksi penghentian sementara,maka akan dikenakan sanksi pencabutan SBU.
4. SBU yang sedang dalam status penghentian sementara kegiatan berusaha dalam Sistem Informasi Jasa Konstruksi berupa turun tayang SBU:
a. Tidak dapat memasukan dokumen penawaran/kualifikasi dalam proses pemilihan penyedia Jasa Konstruksi
b. Tidak dapat digunakan unutk melakukan pengikatan kontrak.
c. Tetap dapat digunakan untuk melaksanakan kontrak sampai dengan berakhirnya kontrak.
5. BUJK yang terkena sanksi hanya pada SBU dengan subklasifikasi yang tertayang.