Penerapan SMAP
(belum memenuhi komitmen penerapan SMAP)No. | NIB | Nama BU | Subklasifikasi | Kualifikasi | LSBU | Noreg SBU | Tanggal Peringatan Tertulis | Peringatan Tertulis, Hari Kerja ke- | Tanggal Batas Waktu Pemenuhan Peringatan Tertulis | Pembekuan, Hari kerja Ke- | Tanggal Batas Waktu Pemenuhan Pembekuan | Keterangan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 9120005331855 | TATAMULIA NUSANTARA INDAH | BG004 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2022.0003039 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
2 | 0220203791644 | NUGRAHA ADI RAYA | BG004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2022.0009179 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
3 | 9120005331855 | TATAMULIA NUSANTARA INDAH | BS001 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2022.0003039 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
4 | 8120217231386 | CHINA ROAD AND BRIDGE CONSTRUCTION INDONESIA | BS011 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2022.0023368 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
5 | 8120109871751 | PRATIWI PUTRI SULUNG | ST004 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2023.0000802 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
6 | 8120312191492 | FREYSSINET TOTAL TECHNOLOGY | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0067509 | 2025-03-13 | - | 2025-04-10 | - | 2025-05-05 | Proses Sanksi |
7 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | ST004 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2022.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
8 | 0220006620248 | SPECTRATAMA PERKASA | BG005 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2022.0009658 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
9 | 0220006620248 | SPECTRATAMA PERKASA | BG009 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2022.0009658 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
10 | 9120101860299 | WULAN CIPTA SEJATI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0046182 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
11 | 1208220044371 | MANUNGGAL SEJAHTERA RAKKUTA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0027460 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
12 | 9120301140391 | INTAN SARANA TEKNIK | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0032956 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
13 | 9120301140391 | INTAN SARANA TEKNIK | BS006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0032956 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
14 | 9120101860299 | WULAN CIPTA SEJATI | BS016 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0046182 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
15 | 9120304362876 | BUMI RIAU INDAH JAYA | BS006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0019147 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
16 | 0912220037589 | ZHONGSHI CHEMICAL ENGINEERING CONSTRUCTION INDONESIA | BS018 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0034551 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
17 | 0912220037589 | ZHONGSHI CHEMICAL ENGINEERING CONSTRUCTION INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0034551 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
18 | 8120313101149 | CHINA JINGYE ENGINEERING CORPORATION LIMITED | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0033648 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
19 | 9120301412538 | BINA NOVITA | BG009 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0068629 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
20 | 9120318081756 | SINAR PUTRA PRATAMA | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2023.0039890 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
21 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BG001 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2023.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
22 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BG002 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2023.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
23 | 8120104702744 | PORT ENGINEERING CSCEC INDONESIA | BG003 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2023.0024433 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
24 | 9120406841025 | BANGUN KARYA PERKASA JAYA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0039365 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
25 | 9120406841025 | BANGUN KARYA PERKASA JAYA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0039365 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
26 | 0201010000737 | FATIMAH INDAH UTAMA | BS004 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2023.0038234 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
27 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0043799 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
28 | 8120113102328 | MCC20 INDONESIA CONSTRUCTION | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2023.0046870 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
29 | 0220006772238 | SEKAWAN TRIASA | BG005 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0072425 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
30 | 0220006772238 | SEKAWAN TRIASA | BG006 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0072425 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
31 | 0220006772238 | SEKAWAN TRIASA | BG007 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0072425 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
32 | 0277001921502 | PADMA INTI INDONESIA | BG009 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0055661 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
33 | 9120001500094 | TRIMITRA ABADI ARTHA MANDIRI | BG009 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2023.0049466 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
34 | 8120202870786 | JETEC INDONESIA | RK004 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2023.0051068 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
35 | 8120202870786 | JETEC INDONESIA | RT002 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RT.B.11.2023.0051068 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
36 | 9120002481217 | ABUN SENDI | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0050614 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
37 | 9120105731028 | BAHAS REKASATYA | BS011 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2023.0030639 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
38 | 9120008771589 | FUDING MANDIRI SEJAHTERA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2023.0022875 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
39 | 0220106350949 | KMU KONSTRUKSI INDONESIA | BS020 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0055494 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
40 | 0908230111893 | OVERSEAS INTL ENGINEERING INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0055609 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
41 | 0277001921502 | PADMA INTI INDONESIA | BS001 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0055661 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
42 | 0220004572673 | MENARD GEOSYSTEMS, SDN. BHD. | BS001 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0056210 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
43 | 9120106641371 | VIN SEPTA JAYA | BS003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0062201 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
44 | 8120014080517 | HAN JIN KONSTRUKSI INDONESIA | BG003 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2023.0057952 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
45 | 8120000922019 | DAEAH E & C INDONESIA | BS004 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2023.0006150 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
46 | 0107220043249 | LIXING LABOUR SERVICE | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2023.0036961 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
47 | 0107220043249 | LIXING LABOUR SERVICE | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2023.0036961 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
48 | 8120107872838 | NITTOC CONSTRUCTION INDONESIA | BS006 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0001737 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
49 | 0220106531037 | BANGUNAN TEKNIK GRUP | GT002 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0009155 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
50 | 0220106531037 | BANGUNAN TEKNIK GRUP | GT005 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0009155 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
51 | 0220106531037 | BANGUNAN TEKNIK GRUP | GT006 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0009155 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
52 | 1905230063875 | CHIKEN ENTERPRISE CO., LTD | BS006 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BS.B.09.2023.0060182 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
53 | 8120112122491 | TRACON INDUSTRI | BS005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2023.0023305 | 2025-01-10 | - | 2025-02-05 | - | 2025-03-05 | Proses Sanksi |
54 | 9120300931332 | BUMI DELTA HATTEN | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0022504 | 2025-04-18 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
55 | 9120205741111 | SUMBERDAYA SEWATAMA | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0066401 | 2025-03-02 | - | 2025-03-21 | - | 2025-04-22 | Proses Sanksi |
56 | 0220106222846 | ANGKASA PURA PROPERTINDO | BG002 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BG.B.04.2024.0057600 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
57 | 9120105912402 | LEE MAX DEVELOPMENT | BG003 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0036158 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
58 | 9120205651372 | ANNAHL ABADI BERSAMA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0039595 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
59 | 2305230007976 | KOLON GLOBAL CORPORATION | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0062714 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
60 | 9120408860392 | SUMBER MITRA JAYA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065612 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
61 | 2309220019736 | ANUGERAH LESTARI SUPINDO KONSTRUKSI | BG003 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2024.0022122 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
62 | 0905230083369 | SHANDONG ZIJIAN CONSTRUCTION GROUP CO., LTD | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0044222 | 2025-03-11 | - | 2025-04-08 | - | 2025-04-30 | Proses Sanksi |
63 | 9120300592822 | SUBOTA INTERNATIONAL CONTRACTOR | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0018344 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
64 | 9120002540663 | REKSA JAYA INDAH | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0063113 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
65 | 0220100800478 | RELIS SAPINDO UTAMA | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0009563 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
66 | 8120119291511 | PUTRA MUDA MANDIRI GROUP | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0050139 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
67 | 9120101860299 | WULAN CIPTA SEJATI | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0046182 | 2025-04-27 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
68 | 9120408860392 | SUMBER MITRA JAYA | BS010 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065612 | 2025-02-24 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
69 | 0220109662062 | MIN HUI INDONESIA | BS004 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BS.B.07.2024.0060673 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
70 | 0220200861005 | CIPTA ADHI GUNA | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0009443 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
71 | 9120507841931 | LIVIA ANDALAN INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0040966 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
72 | 8120210221249 | KARYA MENTARI SERAYA | BG009 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BG.B.09.2024.0020102 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
73 | 1409230119244 | CONFINDO LAKSANA ABADI | GT003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.GT.B.08.2024.0062819 | 2025-02-26 | - | 2025-03-18 | - | 2025-04-16 | Proses Sanksi |
74 | 0501230058528 | SINAR PURNA KARYA | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0066061 | 2025-02-28 | - | 2025-03-20 | - | 2025-04-21 | Proses Sanksi |
75 | 9120002341028 | KARYA MANDIRI KONTRAKTOR | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0063951 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
76 | 0220004210656 | CIPTA MARGA PERSADA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0005313 | 2025-02-16 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
77 | 8120010162806 | ANHUI ELECTRIC POWER CONSTRUCTION INDONESIA | BG003 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0023073 | 2025-04-09 | - | 2025-04-30 | - | 2025-05-26 | Proses Sanksi |
78 | 8120217011891 | RAFA KARYA INDONESIA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0005862 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
79 | 0256010181337 | TRISAKTI CIPTA NUSANTARA | BS011 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0064664 | 2025-02-15 | - | 2025-03-07 | - | 2025-03-28 | Proses Sanksi |
80 | 9120202302659 | TUNAS HARAPAN LAKINAWOLIO | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0062264 | 2025-03-12 | - | 2025-04-09 | - | 2025-05-02 | Proses Sanksi |
81 | 8120118011281 | SPEKTRUM KRISINDO ELEKTRIKA | ST006 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0036494 | 2025-03-19 | - | 2025-04-16 | - | 2025-05-09 | Proses Sanksi |
82 | 9120309541634 | ANGGAZA WIDYA RIDHAMULIA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0012128 | 2025-02-21 | - | 2025-03-13 | - | 2025-04-11 | Proses Sanksi |
83 | 0277001921502 | PADMA INTI INDONESIA | BS007 | Besar | LSBU KONSTRUKSI INDONESIA (ASPEKINDO) | F.1.01.BS.B.09.2024.0055661 | 2025-02-19 | - | 2025-03-11 | - | 2025-04-09 | Proses Sanksi |
84 | 0220208851128 | KURNIA LAKSONO | BS004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0060178 | 2025-02-25 | - | 2025-03-17 | - | 2025-04-15 | Proses Sanksi |
85 | 3001220016616 | KINAYA LIAN INDAH | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0007225 | 2025-02-26 | - | 2025-03-18 | - | 2025-04-16 | Proses Sanksi |
86 | 0911230061235 | MEGA JAYA KONSTRUKSI NUSANTARA | BG003 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0058117 | 2025-02-28 | - | 2025-03-20 | - | 2025-04-21 | Proses Sanksi |
87 | 0911230061235 | MEGA JAYA KONSTRUKSI NUSANTARA | BG002 | Besar | SERTIFIKASI KONTRAKTOR INDONESIA (AKI) | F.1.01.BG.B.07.2024.0058117 | 2025-03-01 | - | 2025-03-21 | - | 2025-04-22 | Proses Sanksi |
88 | 0220001281279 | LABROSCO YAL | BS001 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0065301 | 2025-02-21 | - | 2025-03-13 | - | 2025-04-11 | Proses Sanksi |
89 | 0220109492805 | TIGA BIDADARI KARON | BS010 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0035914 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
90 | 9120014000269 | SRIWIJAYA SUMBER SAKTI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065740 | 2025-02-25 | - | 2025-03-17 | - | 2025-04-15 | Proses Sanksi |
91 | 2102240016237 | HUACHANG KONSTRUKSI INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0068520 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
92 | 0220003120767 | YUNG XING INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0064956 | 2025-02-23 | - | 2025-03-14 | - | 2025-04-14 | Proses Sanksi |
93 | 9120406992657 | PUNDI MAS BAHAGIA | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0004764 | 2025-03-08 | - | 2025-03-28 | - | 2025-04-29 | Proses Sanksi |
94 | 9120207602219 | ASINDO TECH | BG003 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0066956 | 2025-03-07 | - | 2025-03-27 | - | 2025-04-28 | Proses Sanksi |
95 | 0256010181337 | TRISAKTI CIPTA NUSANTARA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0064664 | 2025-03-09 | - | 2025-03-28 | - | 2025-04-29 | Proses Sanksi |
96 | 0220106290144 | Thermax Limited | ST003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0069755 | 2025-04-02 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
97 | 8120019241492 | JAYA TEKNIK INDONESIA | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0017516 | 2025-03-13 | - | 2025-04-10 | - | 2025-05-05 | Proses Sanksi |
98 | 9120305722223 | AREMIX PLANINDO | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0064616 | 2025-03-06 | - | 2025-03-26 | - | 2025-04-25 | Proses Sanksi |
99 | 2309210052078 | SUKSES ABADI KONSTRUKSI INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0004448 | 2025-03-05 | - | 2025-03-25 | - | 2025-04-24 | Proses Sanksi |
100 | 0220107600623 | SHENYANG ALUMINUM AND MAGNESIUM ENGINEERING & RESEARCH INSTITUTE CO., LTD. | ST010 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0068102 | 2025-03-19 | - | 2025-04-16 | - | 2025-05-09 | Proses Sanksi |
101 | 9120303692319 | MARGA MAJU MAPAN | BS001 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0070908 | 2025-04-24 | - | 2025-05-19 | - | 2025-06-13 | Proses Sanksi |
102 | 8120216062523 | RIFANSI DWI PUTRA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0002909 | 2025-03-08 | - | 2025-03-28 | - | 2025-04-29 | Proses Sanksi |
103 | 9120005402369 | JAGAT KONSTRUKSI ABDIPERSADA | BG001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0069779 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
104 | 1234000563517 | BINTANG SEMBILAN INDAH | BG002 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0061693 | 2025-03-20 | - | 2025-04-17 | - | 2025-05-14 | Proses Sanksi |
105 | 9120400282953 | WISMA SARANA TEKNIK | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0021462 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
106 | 1212230129246 | HENGFA CONSTRUCTION INDONESIA | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0066977 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
107 | 3011230049944 | YANLORD TEKNOLOGI ENGINEERING | BS002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0068521 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
108 | 1601240084949 | HAIAN KONSTRUKSI INDONESIA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0068519 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
109 | 1201240069013 | KONSTRUKSI RAJAWALI POWER INDONESIA | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0068612 | 2025-03-22 | - | 2025-04-22 | - | 2025-05-16 | Proses Sanksi |
110 | 2909210046295 | MELO ANEKA RAYA | BS005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0068676 | 2025-03-25 | - | 2025-04-23 | - | 2025-05-19 | Proses Sanksi |
111 | 9120011140679 | RAJA MULTI SARANA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0042910 | 2025-03-26 | - | 2025-04-24 | - | 2025-05-20 | Proses Sanksi |
112 | 8120019241492 | JAYA TEKNIK INDONESIA | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0017516 | 2025-03-28 | - | 2025-04-28 | - | 2025-05-22 | Proses Sanksi |
113 | 0220000531579 | BUMI CAKRAWALA INFRASTRUKTUR | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0044064 | 2025-03-28 | - | 2025-04-28 | - | 2025-05-22 | Proses Sanksi |
114 | 0220004151043 | SEMITER | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0070798 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
115 | 9120005402369 | JAGAT KONSTRUKSI ABDIPERSADA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0069779 | 2025-04-02 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
116 | 9120009102686 | BIRA JAYA MANDIRI PERKASA | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0025898 | 2025-04-01 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
117 | 9120203840291 | PUTRA RATO MAHKOTA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0069973 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
118 | 9120203840291 | PUTRA RATO MAHKOTA | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0069973 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
119 | 9120203840291 | PUTRA RATO MAHKOTA | BG007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0069973 | 2025-04-05 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
120 | 9120013110825 | PRIBUMI GROUP INDONESIA | BS001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0069685 | 2025-04-01 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
121 | 9120109451711 | MODERNATEHNIK PERKASA | BS001 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0000104 | 2025-04-03 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
122 | 9120302300849 | ARKAMAYA WANGSA ALI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0002836 | 2025-04-01 | - | 2025-04-29 | - | 2025-05-23 | Proses Sanksi |
123 | 9120109312321 | MUCOINDO PRAKASA | ST006 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0026681 | 2025-06-04 | - | 2025-06-26 | - | 2025-07-18 | Proses Sanksi |
124 | 0223011032854 | KARYA PERDANA BARU | BG007 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0070672 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
125 | 1251000622253 | MITRA INFRASTRUKTUR SEJAHTERA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0028142 | 2025-04-09 | - | 2025-04-30 | - | 2025-05-26 | Proses Sanksi |
126 | 9120103210916 | ASIA TENGAH KONSTRUKSI | BG002 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0025804 | 2025-04-12 | - | 2025-05-06 | - | 2025-06-02 | Proses Sanksi |
127 | 9120103210916 | ASIA TENGAH KONSTRUKSI | BG001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0025804 | 2025-04-12 | - | 2025-05-06 | - | 2025-06-02 | Proses Sanksi |
128 | 8120203702676 | ZHEJIANG TENAGA PEMBANGUNAN INDONESIA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0061857 | 2025-04-20 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
129 | 9120408860392 | SUMBER MITRA JAYA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0065612 | 2025-04-18 | - | 2025-05-14 | - | 2025-06-10 | Proses Sanksi |
130 | 0901240039683 | TELINCO NETWORKS INDONESIA | BS009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0066958 | 2025-04-26 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
131 | 9120101860299 | WULAN CIPTA SEJATI | BG005 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0046182 | 2025-04-26 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
132 | 9120213110671 | SUMAN TOKO | BG005 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0004129 | 2025-04-26 | - | 2025-05-21 | - | 2025-06-17 | Proses Sanksi |
133 | 9120309743504 | INTI CIPTA SEJATI | BG002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0027650 | 2025-04-29 | - | 2025-05-22 | - | 2025-06-18 | Proses Sanksi |
134 | 9120405972461 | AZA BANAR | BG005 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0002401 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
135 | 0220004151043 | SEMITER | BG003 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0070798 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
136 | 8120006830422 | UNISON KARYATAMA | BS007 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0072477 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
137 | 9120206451966 | SINAR BARU KONTRUKSI | BG003 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BG.B.01.2024.0072706 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
138 | 9120205153602 | FARMEL CIPTA MANDIRI | BS006 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BS.B.03.2024.0022065 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
139 | 0220000531579 | BUMI CAKRAWALA INFRASTRUKTUR | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0044064 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
140 | 8120218012845 | CIPTA GRAHA KANAKA | BG007 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0073731 | 2025-05-22 | - | 2025-06-17 | - | 2025-07-09 | Proses Sanksi |
141 | 9120200641972 | MARGA DWITAGUNA | BS001 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0034733 | 2025-05-22 | - | 2025-06-17 | - | 2025-07-09 | Proses Sanksi |
142 | 0306220052408 | SUMBER JAYA MEGAH | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0013166 | 2025-06-02 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
143 | 0246010240429 | LESTARI NAULI JAYA | BS005 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BS.B.15.2024.0060550 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
144 | 8120001870963 | BUMILOKA TEGARPERKASA | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0070633 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
145 | 0220304752792 | KARYA BISA | BG006 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0074617 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
146 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0043799 | 2025-05-18 | - | 2025-06-12 | - | 2025-07-04 | Proses Sanksi |
147 | 9120300730691 | CHINA FIRST METALLURGICAL INDONESIA | BG003 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BG.B.12.2024.0073993 | 2025-05-24 | - | 2025-06-19 | - | 2025-07-11 | Proses Sanksi |
148 | 9120106531703 | TURELOTO BATTU INDAH | BG002 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0001141 | 2025-06-02 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
149 | 9120106531703 | TURELOTO BATTU INDAH | BG006 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0001141 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
150 | 9120106531703 | TURELOTO BATTU INDAH | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0001141 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
151 | 9120106531703 | TURELOTO BATTU INDAH | BG004 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0001141 | 2025-06-02 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
152 | 9120106531703 | TURELOTO BATTU INDAH | BG005 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0001141 | 2025-06-02 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
153 | 9120206330712 | TIMBUL PERSADA | BS001 | Besar | ASPIRASI ASPAL DAN BETON INDONESIA (PT AABI) | F.1.01.BS.B.13.2024.0074992 | 2025-06-04 | - | 2025-06-26 | - | 2025-07-18 | Proses Sanksi |
154 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG008 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0043799 | 2025-05-26 | - | 2025-06-19 | - | 2025-07-11 | Proses Sanksi |
155 | 9120200641972 | MARGA DWITAGUNA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0034733 | 2025-05-24 | - | 2025-06-19 | - | 2025-07-11 | Proses Sanksi |
156 | 8120108801039 | PURNAMA INDONESIA | BS007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0032327 | 2025-06-07 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
157 | 8120019202518 | TRIMANUNGGAL KARYATAMA | BG009 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0026535 | 2025-07-28 | 5 | 2025-08-15 | |||
158 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0043799 | 2025-05-29 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
159 | 0223011032854 | KARYA PERDANA BARU | BG002 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0070672 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
160 | 0220006220573 | REZA MULTI SARANA | BS001 | Besar | SERTIFIKASI BADAN USAHA GABUNGAN PERUSAHAAN KONSTRUKSI NASIONAL (GAPEKSINDO) | F.1.01.BS.B.04.2024.0016616 | 2025-05-29 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
161 | 9120009871301 | ZTE INDONESIA | ST010 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0076983 | 2025-07-23 | 8 | 2025-08-12 | |||
162 | 9120207792551 | CITRA PERSADA INFRASTRUKTUR | BG002 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0074850 | 2025-06-03 | - | 2025-06-25 | - | 2025-07-17 | Proses Sanksi |
163 | 9120005752754 | HARMONI DEVELOPMEN INDONESIA | BS002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0043799 | 2025-05-31 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
164 | 2505220053451 | SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE CO.,LTD | ST003 | Besar | SERTIFIKASI KONTRAKTOR TERINTEGRASI INDONESIA (AKTI) | F.2.03.ST.B.08.2024.0081592 | 2025-06-04 | - | 2025-06-26 | - | 2025-07-18 | Proses Sanksi |
165 | 8120112130894 | NIAGAMAS SETIAUSAHA | BS007 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0019340 | 2025-06-11 | - | 2025-07-02 | - | 2025-07-23 | Proses Sanksi |
166 | 0252001900578 | JJB RUANG KREASI | BG007 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-06-01 | - | 2025-06-24 | - | 2025-07-16 | Proses Sanksi |
167 | 0220304752792 | KARYA BISA | BG005 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0074617 | 2025-06-04 | - | 2025-06-26 | - | 2025-07-18 | Proses Sanksi |
168 | 0308220019248 | PERUMAHAN BLUESKY BOARD | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0020653 | 2025-06-07 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
169 | 8120016152418 | BENGALON JAYA LESTARI | BS001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0076155 | 2025-06-15 | - | 2025-07-07 | - | 2025-07-28 | Proses Sanksi |
170 | 2801240025517 | PRABA INDOPERSADA | BG003 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0073021 | 2025-06-06 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
171 | 2801240025517 | PRABA INDOPERSADA | BG001 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0073021 | 2025-06-07 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
172 | 8120005942313 | MUTU UTAMA KONSTRUKSI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0059023 | 2025-08-02 | 0 | 2025-08-22 | |||
173 | 8120119060795 | BERKAT BERSAMA SEJATI | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0043636 | 2025-06-11 | - | 2025-07-02 | - | 2025-07-23 | Proses Sanksi |
174 | 8120019102293 | CONDUCTORJASA SURYAPERSADA | BS007 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0075564 | 2025-06-09 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
175 | 0252001900578 | JJB RUANG KREASI | BG001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-06-06 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
176 | 0252001900578 | JJB RUANG KREASI | BG003 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-06-06 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
177 | 9120300730691 | CHINA FIRST METALLURGICAL INDONESIA | BS010 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0073993 | 2025-06-11 | - | 2025-07-02 | - | 2025-07-23 | Proses Sanksi |
178 | 1008230082629 | PEARL RIVER INDONESIA | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0056033 | 2025-06-08 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
179 | 0220304752792 | KARYA BISA | BG001 | Besar | ANDALAN SERTIFIKASI KONTRAKTOR NASIONAL (ASKONAS) | F.1.01.BG.B.03.2024.0074617 | 2025-06-08 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
180 | 9120503702291 | LAVERTON PROTECTION TECHNOLOGY | BG009 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0055376 | 2025-07-26 | 5 | 2025-08-15 | |||
181 | 9120002480082 | JATI WANGI | BS010 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BS.B.10.2024.0024613 | 2025-06-09 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
182 | 0220106102446 | TRIMEDIA IMAJI REKSO ABADI | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0075460 | 2025-06-10 | - | 2025-07-01 | - | 2025-07-22 | Proses Sanksi |
183 | 9120212261521 | BATHARA JAYA SARTIKA | BS001 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BS.B.05.2024.0056407 | 2025-08-01 | 1 | 2025-08-21 | |||
184 | 9120309521156 | JOGLO MULTI AYU | BG005 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0003958 | 2025-06-12 | - | 2025-07-03 | - | 2025-07-24 | Proses Sanksi |
185 | 1812210007548 | LIMADUA SAKTI PESONA | BG009 | Besar | LSBU GAPEKNAS INFRASTRUKTUR (GAPEKNAS) | F.1.01.BG.B.10.2024.0076146 | 2025-06-17 | - | 2025-07-08 | - | 2025-07-29 | Proses Sanksi |
186 | 0252001900578 | JJB RUANG KREASI | BG002 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0074503 | 2025-07-22 | 9 | 2025-08-11 | |||
187 | 1008230082629 | PEARL RIVER INDONESIA | BG005 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0056033 | 2025-06-15 | - | 2025-07-07 | - | 2025-07-28 | Proses Sanksi |
188 | 1008230082629 | PEARL RIVER INDONESIA | BG008 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0056033 | 2025-06-20 | - | 2025-07-11 | - | 2025-08-01 | Penghentian Sementara Kegiatan Berusaha |
189 | 9120205232172 | AMCO JAYA TRI TUNGGAL PRATAMA | BG004 | Besar | ASPEKNAS KONSTRUKSI MANDIRI (ASPEKNAS) | F.1.01.BG.B.05.2024.0061405 | 2025-06-17 | - | 2025-07-08 | - | 2025-07-29 | Proses Sanksi |
190 | 8120007922019 | CHINA RAILWAY ENGINEERING INDONESIA | BS010 | Besar | PT PANCA SATYA JAYATAMA NUSANTARA (GABPEKNAS) | F.1.01.BS.B.12.2024.0013881 | 2025-06-20 | - | 2025-07-11 | - | 2025-08-01 | Penghentian Sementara Kegiatan Berusaha |
191 | 9120301320953 | SEVEN GATES INDONESIA | BS010 | Besar | Gamana Krida Bhakti (GAPENSI) | F.1.01.BS.B.01.2024.0000978 | 2025-08-01 | 1 | 2025-08-21 | |||
192 | 0220103683009 | WOLFERSTAN TROWER INDONESIA | RK001 | Besar | PT SERTIFIKASI BADAN USAHA JASA KONSULTANSI (PERKINDO) | F.3.01.RK.B.11.2024.0077370 | 2025-07-28 | 5 | 2025-08-15 | |||
193 | 0220203811736 | PRADA TATA INTERNASIONAL | AR001 | Besar | Lembaga Sertifikasi INKINDO | F.3.01.AR.B.02.2024.0077953 | 2025-08-01 | 1 | 2025-08-21 | |||
194 | 0220203811736 | PRADA TATA INTERNASIONAL | AR003 | Besar | Lembaga Sertifikasi INKINDO | F.3.01.AR.B.02.2024.0077953 | 2025-08-01 | 1 | 2025-08-21 | |||
195 | 1217000350747 | SMCGC KONSTRUKSI INDONESIA | BG003 | Besar | PT. SERBU KONSTRUKSI MANDIRI | F.1.01.BG.B.15.2024.0076801 | 2025-08-01 | 1 | 2025-08-21 |
2. BUJK yang tidak melakukan pemenuhan persyaratan dan/atau memenuhi kewajiban sesuai dengan peraturan perundang-undangan sampai dengan batas waktu 15 (lima belas) hari kerja sejak ditayangkan peringatan tertulis, maka akan dilakukan penghentian sementara kegiatan berusaha dalam Sistem Informasi Jasa Konstruksi berupa turun tayang SBU.
3. BUJK yang tidak memenuhi kewajiban dalam jangka waktu 15 (lima belas) hari kerja sejak pengenaan sanksi penghentian sementara,maka akan dikenakan sanksi pencabutan SBU.
4. SBU yang sedang dalam status penghentian sementara kegiatan berusaha dalam Sistem Informasi Jasa Konstruksi berupa turun tayang SBU:
a. Tidak dapat memasukan dokumen penawaran/kualifikasi dalam proses pemilihan penyedia Jasa Konstruksi
b. Tidak dapat digunakan unutk melakukan pengikatan kontrak.
c. Tetap dapat digunakan untuk melaksanakan kontrak sampai dengan berakhirnya kontrak.
5. BUJK yang terkena sanksi hanya pada SBU dengan subklasifikasi yang tertayang.